    Flexibility value in electric transmission expansion planning

    • Exportar citas
      • Exportar a Refworks
      • Exportar a Ris
      • Exportar a Endnote
      • Exportar a Mendeley
    URI
    http://hdl.handle.net/10584/10133
    Registro completo
    Mostrar el registro completo del ítem
    Autor
    Henao Pérez, Alvin Arturo
    Fecha
    2016
    Resumen
    Electric Transmission Expansion Planning (TEP) is a complex task exposed to multiple sources of uncertainties when the electricity market has been restructured. Approaches like those based on scenarios and robustness have been proposed and used by planners to deal with uncertainties. Alternatives of solution for expansion are identified and economically evaluated through methodologies based on Discounted Cash Flow (DCF). In general, these approaches have the risk to produce undersized or oversized designs of transmission lines because of uncertainties in demand growth rates and economies of scale. In addition, DCF helps to make a decision only with the information available today and it does not consider managerial flexibility. In consequence, transmission expansion projects are auctioned and the winner investor is forced to execute the project under bidding terms without the possibility to adapt the project to unpredictable events. This research introduces flexibility in TEP process and estimates its value as an approach to cope with uncertainties. A methodology based on Real Options is used and the value of flexibility is estimated in terms of social welfare. In particular, an option to defer a transmission expansion is applied and its value is estimated by using a binomial tree technique. Two case studies are analyzed: A two-node case and a reduced version of the Colombian transmission network. Conclusions suggest flexibility is a valid approach to be introduced in TEP in order to handle uncertainties.
    Colecciones a las que pertenece
    • Tesis Doctorado en Ingeniería Industrial [9]
    72161005.pdf (1.469Mb)Visualizar
    -

    DSpace software copyright © 2002-2016  DuraSpace
    Contacto | Sugerencias
    Theme by 
    Atmire NV
     

     

    Listar

    Todo DSpaceComunidades & ColeccionesPor fecha de publicaciónAutoresTítulosMateriasEsta colecciónPor fecha de publicaciónAutoresTítulosMaterias

    Mi cuenta

    AccederRegistro

    DSpace software copyright © 2002-2016  DuraSpace
    Contacto | Sugerencias
    Theme by 
    Atmire NV