• Login
    Ver ítem 
    •   DSpace Principal
    • División Ingenierías
    • Departamento de Ingeniería Industrial
    • Proyectos finales Pregrado en Ingeniería Industrial
    • Ver ítem
    •   DSpace Principal
    • División Ingenierías
    • Departamento de Ingeniería Industrial
    • Proyectos finales Pregrado en Ingeniería Industrial
    • Ver ítem
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Diseño de una herramienta para la programación de la producción de la empresa Modultek S.A.S.

    Design of a tool for the production scheduling of the company Modultek S.A.S.

    • Exportar citas
      • Exportar a Refworks
      • Exportar a Ris
      • Exportar a Endnote
      • Exportar a Mendeley
    URI
    http://hdl.handle.net/10584/11557
    Registro completo
    Mostrar el registro completo del ítem
    Autor
    Pinto de la Cruz, Jailene
    Guzmán Guzmán, Mariangélica
    Polo López, Jaime Andrés
    Fecha
    2023-05-30
    Resumen
    El presente proyecto de investigación tiene como objetivo el diseño de una herramienta para facilitar la programación de la producción de una empresa productora de muebles de tipo modular en melamina, con el propósito de solucionar la problemática referente a la carencia de un sistema eficiente de programación que en la actualidad afecta negativamente las utilidades de la empresa. La solución propuesta contempla la creación de un panel de control (Dashboard) y una herramienta de programación que permitirá establecer el momento adecuado para la producción de cada artículo, plazos de entrega y recursos a emplear, con el fin de minimizar los costos y tiempos de espera de los clientes, así como el tiempo de espera por el abastecimiento de la materia prima. Para el diseño e implementación de estas herramientas, se sugiere realizar un análisis exhaustivo de los procesos productivos y la disponibilidad de recursos, así como utilizar algoritmos y modelado de datos. Con la implementación de esta herramienta, se espera mejorar significativamente la eficiencia de la empresa.
     
    This research project aims to design a tool to facilitate the production scheduling of a manufacturing modular type of furniture in melamine, in order to address the challenge of lacking an efficient scheduling system, that currently negatively affects the profits of the company. The proposed solution contemplates the creation of a control panel (Dashboard) and a programming tool that will allow for establishing the appropriate time for the production of each item, delivery times, and resources to be used, to minimize the costs and waiting times of the customers, as well as the waiting time for raw material supply. For the design and implementation of these tools, a comprehensive analysis of the production processes and resource availability is recommended, along with the utilization of algorithms and data modeling. The implementation of this tool is expected to significantly improve the company's efficiency by enhancing production scheduling capabilities and improving resource utilization.
     
    Colecciones a las que pertenece
    • Proyectos finales Pregrado en Ingeniería Industrial [441]
    DASHBOARD PDF.pdf (165.6Kb)Visualizar
    -
    DASHBOARD.png (163.4Kb)
    DASHBOARD ING.pdf (97.73Kb)Visualizar
    DASH ING.png (325.7Kb)

    DSpace software copyright © 2002-2016  DuraSpace
    Contacto | Sugerencias
    Theme by 
    Atmire NV
     

     

    Listar

    Todo DSpaceComunidades & ColeccionesPor fecha de publicaciónAutoresTítulosMateriasEsta colecciónPor fecha de publicaciónAutoresTítulosMaterias

    Mi cuenta

    AccederRegistro

    DSpace software copyright © 2002-2016  DuraSpace
    Contacto | Sugerencias
    Theme by 
    Atmire NV