• Login
    Ver ítem 
    •   DSpace Principal
    • División Ingenierías
    • Departamento de Ingeniería Industrial
    • Proyectos finales Pregrado en Ingeniería Industrial
    • Ver ítem
    •   DSpace Principal
    • División Ingenierías
    • Departamento de Ingeniería Industrial
    • Proyectos finales Pregrado en Ingeniería Industrial
    • Ver ítem
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Simulador de valoración del riesgo a partir de matriz global de vehículos tercerizados de OPL

    Risk assessment simulator based on the global matrix of outsourced OPL vehicles

    • Exportar citas
      • Exportar a Refworks
      • Exportar a Ris
      • Exportar a Endnote
      • Exportar a Mendeley
    URI
    http://hdl.handle.net/10584/7893
    Registro completo
    Mostrar el registro completo del ítem
    Autor
    Radi Chemás, Samir Eduardo
    Nieto Jimenez, Jose
    Fecha
    2018-05-16
    Resumen
    En el área de mantenimiento de la Organización OPL Carga, la decisión de otorgar un crédito financiero a los dueños de los vehículos que conforman la flota tercerizada de OPL (con el fin de ejecutar cualquier servicio de manutención dentro de la planta de la misma organización) se ha caracterizado por ser un proceso subjetivo y en muchas ocasiones sin fundamentos estadísticos reales que respalden las decisiones escogidas. Debido a dicha subjetividad sobre la concesión de estos créditos, en muchas ocasiones el recaudo del dinero (el cual es recuperado por cruces de cuentas correspondientes a servicios que estos vehículos prestan a OPL) sobrepasa las fechas límites de los plazos pactados en los créditos entre la organización y el propietario beneficiado del servicio de mantenimiento, afectando así las finanzas de la empresa. El “Simulador de valoración del riesgo a partir de matriz global de vehículos tercerizados de OPL” es una herramienta que arroja un resultado cuantitativo. que tiene en cuenta varios criterios de riesgo que son relevantes en el recaudo oportuno del dinero prestado por la organización; creando así un resultado netamente estadístico y consistente con el historial global de los vehículos y su relación con la empresa. El simulador es alimentado por una matriz creada exclusivamente para el proyecto, a partir de bases de datos actualizadas de la empresa, con un tiempo de vigencia de dos años con el fin de no sesgar el estudio con información no contextualizada. Esta propuesta tiene como propósito final, reducir el riesgo de no cumplimiento del recaudo del dinero en las fechas pactadas previamente y no afectar así la sostenibilidad del área de mantenimiento. La matriz de riesgos que alimenta el simulador puede ser base posteriormente para la creación o adaptación de otras matrices que alimenten simuladores para otros estudios de gestión del riesgo en distintas áreas de la organización.
     
    In the maintenance area of ​​the Organization: OPL Carga, the decision to grant a financial credit to the owners of the vehicles that make up the outsourced fleet of OPL (in order to execute any maintenance service within the plant of the same organization) It has been characterized as a subjective process and in many cases without real statistical foundations that support the chosen decisions. Due to this subjectivity on the granting of these credits, many times collecting the money (which is recovered by accounts crossed corresponding to services that these vehicles lend to OPL) exceeds the deadlines of the terms agreed in the credits between the organization and the owner of the maintenance service, thus affecting the company's finances. The "Simulator of risk assessment based on the global matrix of outsourced vehicles of OPL" is a tool that yields a quantitative result. that takes into account several risk criteria that are relevant in the timely collection of money lent by the organization; thus creating a purely statistical result consistent with the global history of the vehicles and their relationship with the company. The simulator is powered by a matrix created exclusively for the project, based on updated databases of the company, with a validity period of two years in order not to bias the study with non-contextualized information. The purpose of this project is to reduce the risk of non-compliance with the recollection of money on the dates previously agreed upon and thus not affect the sustainability of the maintenance area. The risk matrix that feeds the simulator can be used later to create or adapt other matrices that feed simulators for other risk management studies in different areas of the organization.
     
    Colecciones a las que pertenece
    • Proyectos finales Pregrado en Ingeniería Industrial [340]
    IMAGEN 1 SR.jpg (30.20Kb)
    IMAGEN 2 SR.pdf (308.7Kb)Visualizar
    IMAGEN 3 (16.20Kb)

    DSpace software copyright © 2002-2016  DuraSpace
    Contacto | Sugerencias
    Theme by 
    Atmire NV
     

     

    Listar

    Todo DSpaceComunidades & ColeccionesPor fecha de publicaciónAutoresTítulosMateriasEsta colecciónPor fecha de publicaciónAutoresTítulosMaterias

    Mi cuenta

    AccederRegistro

    DSpace software copyright © 2002-2016  DuraSpace
    Contacto | Sugerencias
    Theme by 
    Atmire NV