• Login
    Ver ítem 
    •   DSpace Principal
    • División Ingenierías
    • Departamento de Ingeniería Industrial
    • Proyectos finales Pregrado en Ingeniería Industrial
    • Ver ítem
    •   DSpace Principal
    • División Ingenierías
    • Departamento de Ingeniería Industrial
    • Proyectos finales Pregrado en Ingeniería Industrial
    • Ver ítem
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Rediseño del proceso de descargue de camiones T2 EN Coca cola Femsa basado en herramientas Lean

    Redesign of the T2 truck unloading process based on lean tools

    • Exportar citas
      • Exportar a Refworks
      • Exportar a Ris
      • Exportar a Endnote
      • Exportar a Mendeley
    URI
    http://hdl.handle.net/10584/8763
    Registro completo
    Mostrar el registro completo del ítem
    Autor
    Cahuana, Bellini
    Paternina, Luis
    Salcedo, kevin
    Fecha
    2019-12-03
    Resumen
    En este proyecto se presenta el rediseño del proceso de descargue de camiones T2 en Coca-Cola FEMSA basado en herramientas Lean. Este rediseño, se planteó con el objetivo de reducir el tiempo de ciclo y los desperdicios presentes en el proceso. La problemática se evidencia en los tiempos de espera extensos que se presentan entre las diferentes etapas del proceso de cargue. Con base en la filosofía Lean, se llevó a cabo un diagnóstico de la situación actual, se identificaron oportunidades de mejora y se propusieron soluciones para cada una de ellas, con el fin de reducir los diferentes tipos de desperdicios del proceso. Por último se entregó a la compañía un plan para la validación del funcionamiento del proyecto y la implementación del mismo. Posterior a la puesta en marcha, se espera que el tiempo de ciclo se reduzca hasta en 50%, reducción de costos operativos como consecuencia de la disminución de horas extra. Asimismo, con el rediseño planteado, mejorará el aprovechamiento de los recursos en el proceso, tales como: operarios, maquinaria, tiempo y espacio.
     
    This project presents the redesign of the T2 truck unloading process in Coca-Cola FEMSA based on Lean tools. This redesign was proposed with the objective of reducing cycle time and the different types of waste that are present in the process. The problem is visible in the long waiting times that occur between the different stages of the loading process. Based on the Lean philosophy, a diagnosis of the current situation was carried out, improvement opportunities were identified and solutions inspired on lean tools were proposed for each of them , in order to reduce the different types of waste in the process. Finally, a plan for the validation of the redesign and its implementation was delivered to the company. After implementation, the cycle time is expected to be reduced by up to 50% , reducing operating costs as a result of the decrease in overtime. On the other hand, the proposed redesign will improve the use of resources in the process, such as: operators, machinery, time and space.
     
    Colecciones a las que pertenece
    • Proyectos finales Pregrado en Ingeniería Industrial [340]
    Camión T2 siendo descargado (2.814Mb)

    DSpace software copyright © 2002-2016  DuraSpace
    Contacto | Sugerencias
    Theme by 
    Atmire NV
     

     

    Listar

    Todo DSpaceComunidades & ColeccionesPor fecha de publicaciónAutoresTítulosMateriasEsta colecciónPor fecha de publicaciónAutoresTítulosMaterias

    Mi cuenta

    AccederRegistro

    DSpace software copyright © 2002-2016  DuraSpace
    Contacto | Sugerencias
    Theme by 
    Atmire NV