Design of an electrical installation for a rest center

dc.contributor.advisorArango Manrique, Adriana
dc.contributor.advisorSoto Ortiz, Jose
dc.contributor.authorGamero Pardo, Camilo Andrés
dc.contributor.authorPosada Diaz, Leonardo David
dc.date.accessioned2020-12-07T16:40:49Z
dc.date.available2020-12-07T16:40:49Z
dc.date.issued2020-11-22
dc.identifier.urihttp://hdl.handle.net/10584/9354
dc.description.abstractEste proyecto consiste en una instalación eléctrica de un centro de reposo ubicado en la ciudad de Cartagena, desarrollado principalmente para un usuario que no cuenta con un diseño eléctrico en su instalación, por lo tanto, desde el punto de diseño básico de ingeniería, se dará una solución siguiendo las pautas dadas por la NTC 2050 y el RETIE (Reglamento técnico de instalaciones eléctricas) y el estudio bajo normas internacionales como IEEE 80 2000, IEC 60479-2,IEC 60947-1, IEC 60664-2, entre otras. Debido a esto, se revisan las posibles alternativas que se pueden encontrar al momento de realizar un diseño en una instalación, que serán: el tipo de subestación a instalar, que tipo de protección es conveniente, como realizar la acometida y si es necesario realizar un modelo inteligente o semi inteligente. Cada una de estas soluciones serán seleccionados bajo criterios tipo costo, eficiencia, durabilidad, área disponible, sensibilidad, control y seguridad, dependiendo de que alternativa se trate bajo la selección de una matriz de decisión. Por otro lado, se realiza un estudio de análisis de riesgo bajo el software IEC RISK ASSESSMENT CALCULATOR ante fallas externas (Descargas atmosféricas directas e indirectas), ya una vez bajo los resultados obtenidos se realiza el presupuesto, dejando por fuera obras civiles, dando un resultado total de $238.763.345 millones con IVA sobre la utilidad para el año 2020.es_ES
dc.description.abstractThis project consists of an electrical installation of a rest center located in the city of Cartagena, developed mainly for a user who does not have an electrical design in their installation, therefore, from the point of basic engineering design, it will be a solution following the guidelines given by the NTC 2050 and the RETIE (technical regulation of electrical installations) and the study under international standards such as IEEE 80 2000, IEC 60479-2, IEC 60947-1, IEC 60664-2, among others. Due to this, the possible alternatives that can be found when making a design in an installation are reviewed, which will be: the type of substation to be installed, what type of protection is appropriate, how to make the connection and if it is necessary to carry out a smart or semi-smart model. Each of these solutions will be selected under criteria such as cost, efficiency, durability, available area, sensitivity, control and safety, depending on which alternative is treated under the selection of a decision matrix. On the other hand, a risk analysis study is carried out under the IEC RISK ASSESSMENT CALCULATOR software in the event of external failures (direct and indirect atmospheric discharges), and once the results are obtained, the budget is made, leaving out civil works, giving a total result of $ 238,763,345 million with IVA on utility for the year 2020.en_US
dc.language.isospaes_ES
dc.publisherBarranquilla, Universidad del Norte, 2020es_ES
dc.rightsUniversidad del Nortees_ES
dc.subjectDiagrama unifilares_ES
dc.subjectCuadro de cargases_ES
dc.subjectNormativaes_ES
dc.subjectRiesgoes_ES
dc.subjectPresupuestoes_ES
dc.subjectProteccioneses_ES
dc.subjectInstalacioneses_ES
dc.subjectTransformadores_ES
dc.subjectCanalizacioneses_ES
dc.titleDiseño de una instalación eléctrica para un centro de reposoes_ES
dc.titleDesign of an electrical installation for a rest centeren_US
dc.typearticlees_ES
dc.rights.accessRightsopenAccesses_ES