    Diseño de un sistema de climatización para un quirófano tipo B en el municipio de Galapa/Atlántico

    Design of an air conditioning system for a type B operating room in the municipality of Galapa.

    • Exportar citas
      • Exportar a Refworks
      • Exportar a Ris
      • Exportar a Endnote
      • Exportar a Mendeley
    URI
    http://hdl.handle.net/10584/7347
    Registro completo
    Mostrar el registro completo del ítem
    Autor
    Diaz Coneo, Kelsin David
    Patiño Mendoza, Jorge Andres
    Vera Garcia, Leonidas
    Fecha
    2017-05-25
    Resumen
    En este proyecto se presenta el proceso de diseño de un sistema de climatización para un quirófano tipo B en un hospital del municipio de Galapa, el cual se encuentra actualmente en proceso de construcción. El diseño se realiza con el propósito de generar un ambiente aséptico y de confort a través de diversas etapas de filtrado, apuntando a reducir la problemática de diversas instalaciones hospitalarias con el número de infecciones nosocomiales que se producen durante la intervención quirúrgica. Por otro lado, se busca incrementar la eficiencia energética de los equipos; mediante la implementación de sistemas de control tipo VAV (Volumen de Aire Variable). Bajo los lineamientos de la ASHRAE, se realizan los cálculo de carga térmica y se proponen diversas alternativas que puedan satisfacer dichos requerimientos, para finalmente hacer la selección de la mejor de estas, a partir de varios criterios ingenieriles implementando la herramienta computacional Expert Choice, teniendo en cuenta análisis económicos, así como la instalación y mantenimiento de los equipos. La alternativa seleccionada es el sistema de refrigeración por compresión de vapor de alta eficiencia destaca por el tipo de aplicación, sus condiciones de Asepsia, Eficiencia Térmica e impacto ambiental; sin embargo posee una limitante en el factor económico por el alto precio de sus equipos. Al finalizar, se puede observar que la alternativa escogida según el cronograma ofrece un periodo de duración de 83 días hábiles, y que después de un análisis financiero se encuentra que el proyecto posee un VPN de $35´231.809 y un periodo de retorno de la inversión de 2,2 años para un estimado de 10 años de vida útil de los equipos que integran el sistema.
     
    This project presents the designing process of an air conditioning system for a type B operating room in the municipality of Galapa, which is currently under construction. The design is performed with the purpose of generating an aseptic and comfort environment through various filtering stages, aiming to reduce the problem of various hospital facilities with the number of nosocomial infections that occur during the surgical intervention. On the other hand, it seeks to increase the energy efficiency of the equipment through the implementation of control systems type VAV (Variable Air Volume). Having as reference ASHRAE, through the calculation of thermal load, several alternatives are proposed that can satisfy these requirements, to finally make the selection of the best one, based on several engineering criteria implementing the Expert Choice computer tool, taking into account, Economic analysis, as well as the installation and maintenance of equipment. The chosen alternative is the system of refrigeration by steam´s compression of high efficiency stands out by the type of application, its conditions of Asepsis, Thermal Efficiency and environmental impact; however it has a limitation in the economic factor due to the high price of its equipment. At the end, it can be observed that the chosen alternative according to the schedule offers a period of duration of 83 working days, and after a financial analysis it is found that the project has a VPN of $ 35’231.809 and a period of investment´s return of 2,2 years for an estimated of 10 years of useful life of the equipment that integrate the system.
     
    Colecciones a las que pertenece
    • Proyectos finales Pregrado en Ingeniería Mecánica [192]
    DISENO DE UN SISTEMA DE CLIMATIZACION PARA UN QUIROFANO TIPO B EN EL MUNICIPIO DE GALAPA, ATLANTICO.pdf (307.2Kb)Visualizar
    -
    DISENO DE UN SISTEMA DE CLIMATIZACION PARA UN QUIROFANO TIPO B EN EL MUNICIPIO DE GALAPA, ATLANTICO.png (58.66Kb)

    DSpace software copyright © 2002-2016  DuraSpace
    Contacto | Sugerencias
    Theme by 
    Atmire NV
     

     

    Listar

    Todo DSpaceComunidades & ColeccionesPor fecha de publicaciónAutoresTítulosMateriasEsta colecciónPor fecha de publicaciónAutoresTítulosMaterias

    Mi cuenta

    AccederRegistro

    DSpace software copyright © 2002-2016  DuraSpace
    Contacto | Sugerencias
    Theme by 
    Atmire NV